Another piece is done: Anas today opened an overpass to traffic as part of the construction works of lot 1 of the new state road 195 "Sulcitana", under construction. The infrastructure was built in Santa Barbara , in Capoterra .

The flyover, connecting to the town of Poggio dei Pini, passes over the new state road 195 and adds to the previous connection works with the local road system already opened to traffic in recent months.

From the road management company they also let it be known that «the works for the construction of lot 1 are proceeding at the same time . The route extends from Capoterra to Sarroch for about 8 kilometers with four lanes and connects to the already existing lot 2 managed by the Cacip. Completion of the works is expected by the end of 2023.

(Unioneonline/E.Fr.)

© Riproduzione riservata