Traffic haywire and long queues this morning in viale Colombo , in Quartu Sant'Elena , due to work on the road surface to repair a leak .

The damage was caused by the breakage of an Abbanoa pipe due to wear .

Workers immediately set to work to repair the pipeline , in an intervention that was not easy due to the massive leak.

Falla already closed , now off to the roadway restoration operations.

(Unioneonline)

© Riproduzione riservata