LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 15 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità
  • Contatti

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
the provision

Cagliari, new construction site on the port front: goodbye to the maritime station, work on seaside hotels and maxi yachts

Authority order, access to the Sanità pier prohibited from the 27th: the bulldozers are coming
23 gennaio 2025 alle 16:07Aggiornato il 23 gennaio 2025 alle 16:54
Cagliari, new construction site on the port front: goodbye to the maritime station, work on seaside hotels and maxi yachts
Il render del progetto
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_2
  • I cambiamenti
    Caffè Scorretto

    I cambiamenti

    Tacitus

Articoli correlati

A four-hour flight from Elmas Airport postponed the match between Roma 1927 and Monastir 1983.
Five-a-side football

A four-hour flight from Elmas Airport postponed the match between Roma 1927 and Monastir 1983.

The white and blues were unable to reach the capital for the Serie B match scheduled for 3pm. The Sardinian club will appeal to obtain the rescheduling
Antonio Serreli
Alghero, fears at the Santa Maria La Palma dog shelter: warehouse on fire
The fire

Alghero, fears at the Santa Maria La Palma dog shelter: warehouse on fire

The alarm was raised around 6 p.m. for a fire that broke out in a warehouse. The firefighters' quick intervention prevented injuries to the workers and the animals housed there.
Catherine Flowers
Two girls rescued after being lost in the dark and rain near the Capo Nieddu waterfalls.
Cuglieri

Two girls rescued after being lost in the dark and rain near the Capo Nieddu waterfalls.

The alarm was raised shortly before the cell phone ran out of battery. They were located near a nuraghe thanks to the geolocation of the call.
Piles of fishing nets to be recycled: the Vox Maris project in Porto Torres
environment

Piles of fishing nets to be recycled: the Vox Maris project in Porto Torres

The BioDesign Foundation's project removed spent equipment abandoned on the docks. The operation was featured in a documentary directed at Brussels.
Mariangela Pala
San Vero Milis: The Pinna brothers leave all their assets to the municipality.
the donation

San Vero Milis: The Pinna brothers leave all their assets to the municipality.

However, one property will be converted into a senior center. The resolution accepting the inheritance will be approved by the Council on Monday.
Sara Pinna
Seneghe, rural road network: the Attopiziu-Sirisi road has been upgraded.
Infrastructure

Seneghe, rural road network: the Attopiziu-Sirisi road has been upgraded.

The road, which had been in a state of disrepair for decades, has been repaired. Mayor Albina Mereu: "Let's restore dignity and a future to our countryside."
Joseph Pintus
Temporary healthcare workers to be made permanent: protests outside the Regional Council on Tuesday
healthcare

Temporary healthcare workers to be made permanent: protests outside the Regional Council on Tuesday

A demonstration has been scheduled for Tuesday, November 17th, in front of the Chamber on Via Roma. Angioni: "It's unacceptable to discriminate against those who have ensured the stability of departm…
Ollastra, a morning dedicated to memory and legality with Falcone's escort car
the initiative

Ollastra, a morning dedicated to memory and legality with Falcone's escort car

In a display case, the vehicle destroyed in the Capaci massacre of May 23, 1992.
Sara Pinna
Quartu: Waste bins on pedestrian crossings on Via Polonia: residents protest
environment

Quartu: Waste bins on pedestrian crossings on Via Polonia: residents protest

Containers from some businesses remain for days on newly resurfaced crossings. Residents are calling for action after recent checks targeted only domestic users.
Georgia Daga

New construction site on the Cagliari port front. From January 27, access to unauthorized people and vehicles in the Sanità pier area will be prohibited: this is provided for by an order from the port authority in view of the start of work to demolish the old maritime station which will make way for an extra luxury hotel with a dock for maxi yachts.

"The area", the provision reads, "will be delimited with a mobile fence with blackout netting and New Jersey, by the construction company Ing. Raffaello Pellegrini Srl ", the same company that is working on the never-ending construction site on Via Roma, in other areas of the port, at the Ex fas of Elmas and that shortly - barring any unexpected developments - will have to proceed with the demolition and reconstruction of the San Benedetto market.

The construction site will be carried out on behalf of the Porto Rotondo Marina, through a project financing that foresees a private investment of 34 million euros.

The project is divided into three substantial parts: «The complete redevelopment and conversion of the former maritime station into a multipurpose center for recreational boating services and for the tourist use of the area; the revision of the landing system for yachts and private boats along the Calata Sant'Agostino and the arrangement of the public space between the new landings and the Via Roma landing».

Cagliari, new construction site on the port front: goodbye to the maritime station, work on seaside hotels and maxi yachts
Il render del progetto

The plan is for "the complete reconstruction of the old passenger terminal, which will be developed on three levels plus a basement used for technical rooms. In the new configuration, the ground floor of the structure will be dedicated to recreational boating services with reception, waiting room, staff and security offices, toilets, luggage storage, first aid clinics, but also commercial and catering activities with outdoor spaces facing the sea and an infinity pool. The upper floors, on the other hand, will house 36 rooms, a wellness area with gym and spa, a swimming pool and panoramic terraces". The entire building, in the new design variant, "will be surmounted by a canopy perforated in various points to recall the designs of traditional local carpets and, with particular architectural features, will be inspired by the shape of a sail supported by steel poles that recall the masts of boats".

Cagliari, new construction site on the port front: goodbye to the maritime station, work on seaside hotels and maxi yachts
Il render del progetto

Regarding the tourist port, the intervention foresees the use of the current layout also for mega yachts.

For all the surrounding public space, the project reconfirms the rationalization of green and pedestrian areas. In fact, the current driveway closest to Via Roma will be maintained, served by parking lots and separated from the remaining part by large green spaces, while a new double-lane cycle path of almost 400 meters will run parallel to the driveways, from the Calata Azuni roundabout to the Darsena, creating a new connection axis for alternative mobility with the existing cycle/pedestrian paths. The public pedestrian space will see alternating paths paved in stone, wood and green areas. At the base of the Molo Sanità, in a central position of the project, a square paved in limestone will be created, which will host a large rectangular fountain, with an infinity edge and the 3 sculptures by Pinuccio Sciola, which will be enhanced by special scenographic lighting.

Enrico Fresu

© All rights reserved