The construction site at night, with the ex 554 closed to traffic, should have lasted until dawn on Saturday. At least this was the timetable hypothesized and announced by the Municipality of Quartu , together with the company in charge of the safety works of the overpass at via Biora, but the times have been brought forward: from today the walkway is usable again by pedestrians I want to cross the former state road to reach the artisan area.

Also reopened to traffic was the stretch of 554 Quartese which had been closed since Monday - from Margine Rosso to Pitz'e Serra - to allow construction work to be carried out at night, from 10pm to 6am.

The decision - taken after the report provided by the manager of the Environment and Technological Services sector, which shows the verification of the safety measures after the works carried out in recent days - is contained in the ordinance signed today by the mayor Graziano Milia, with which it is " the interdiction on the use of the pedestrian walkway of viale Europa, near the intersection with via Biora, has been revoked».

© Riproduzione riservata