Salvini to Oschiri for the reopening, after two years, of the Diana Bridge
For now we travel on the Coghinas in an alternating one-way direction. Anas: the four lanes open between Ardara and OzieriThe Minister of Infrastructure and Transport, Matteo Salvini, inaugurated the reopening of the Diana Bridge on Lake Coghinas in the afternoon in Oschiri . The works involved the consolidation of the reinforced concrete structure and the conservative restoration, for a total value of approximately 9 million euros.
The construction site took into account the indications of the Superintendence of Sassari: built in the 1920s, the bridge has a length of 315 meters divided into 15 spans of 16 meters and a central arch of 72 metres . It had been closed in June 2022. The prefect of Sassari, Grazia La Fauci, the extraordinary administrator of the Province of Sassari, Pietro Fois and the head of Anas Sardegna, Francesco Ruocco, spoke with the minister.
There is further good news: from today all 12 kilometers of lot 2 of the state road 729 "Sassari Olbia", between Ardara and Ozieri, are passable with four lanes, in addition to the opening to traffic of approximately 5 kilometres. of lot 4, between Berchidda and Oschiri which also include the Oschiri junction .
(Unioneonline)