Just under one million euros to build a tree-lined car park in the camper area in front of Campo Tharros and to transform the construction site adjacent to the entrance to the San Pietro cemetery into a green area with parking area.

The Giunta Sanna has approved the technical and economic feasibility project which will allow for the connection of the new ring road with the business center of Oristano Ovest . «The main purpose of the general project is the creation of a new public space that redesigns that area – explains the mayor Massimiliano Sanna -. The objective is the valorisation and reconversion of an area in a state of decay which is currently characterized as a large urban void».

In detail, the 928 thousand euro intervention will make it possible to create "a pedestrian park, safeguarding the existing trees, which leads to the square at the entrance to the cemetery - says the commissioner for public works Simone Prevete - A parking lot and a square are also planned access to the park surrounded by greenery".

The camper area will maintain its parking function, but with new services. "A column equipped with a card payment system will be installed for the supply of water and the discharge of waste water - concludes Prevete - as well as a latest generation drainage well".

© Riproduzione riservata