Investigate the preparatory studies (of producibility, anemometrics, and range risk) for the Saccargia wind farm project , because the permits were issued based on unreliable data.

The request was addressed to the Sassari Public Prosecutor, Armando Mammone, and came from the Gallura Coordination against wind and photovoltaic speculation and the Sarcidano Committee.

On Thursday, a complaint was filed at the Sassari Prosecutor's Office with a voluminous dossier, accompanied by various documents and attachments.

The civic committees against wind energy speculation have called for a thorough investigation into the authorization process for the Erg Wind Sardegna srl project .

The company intends to decommission all the wind turbines of an existing park in the Nulvi and Ploaghe areas (51 units of 0.85 MW) and build 27 new, enormous, 4.5 MW wind turbines.

The full article by Andrea Busia in L'Unione Sarda, available on newsstands today and on the Digital App.

© Riproduzione riservata