High utility bills are bringing small and medium-sized Sardinian businesses to their knees. The alarm is nationwide, but in an island region, the burden is even greater in terms of extra costs.

The theme is at the heart of the 22nd edition of the "Energies and Sustainability Confartigianato High School" convention, scheduled from today until September 23 in Domus de Maria .

High energy costs mean curbed competitiveness and a growing gap with other European countries, underlines Confartigianato : "We pay 3.7 billion more than the European average, 47.4% of which is due to fiscal and parafiscal charges," explains the association's president Marco Granelli , who is calling on the Government to cut taxes.

As for the island, it is estimated that Sardinia's 95,000 small and medium-sized businesses have incurred €103 million in additional electricity costs over the European average in recent months . Higher electricity bills have impacted the regional GDP by 0.25%, placing Sardinia fourth in this dismal ranking. "We need to find solutions so that Sardinian businesses can be competitive throughout Europe," said Giacomo Meloni, president of Confartigianato Imprese Sardegna .

Among those speaking today at Domus de Maria were former Prime Minister and former European Commissioner Paolo Gentiloni , former President of the Chamber Pierferdinando Casini and Sardinian Governor Alessandra Todde .

The minister

But the most anticipated speech was that of the Minister of the Environment and Energy Security , Gilberto Pichetto Fratin . From Domus de Maria, he announced that on Wednesday the Senate will definitively approve the nuclear power delegation law , which aims to have Italy's first nuclear power plant by 2035.

Where? "I have committed to presenting the legislative decrees with the criteria for identifying the areas ," the minister explained. "Here too, the Regions will have a significant role , and the business system and consumer groups will have a role in making proposals." They won't be large power plants, but "small reactors with a very different location than first- and second-generation power plants."

The government official also promised: "We will speed up the bill decree, even at the cost of a clash with the EU Commission. I'm a pro-European, but we have a national interest to protect. Since six months of negotiations have yielded no conclusions, we must make national decisions."

(Unioneonline/L)

© Riproduzione riservata