the project
03 giugno 2026 alle 07:16aggiornato il 03 giugno 2026 alle 07:20
Tyrrhenian Link: Traffic chaos. Concerns remain about potential pollution.
The massive electrical connection is almost complete. While awaiting cleanup, technicians warn: "We'll have to deal with the sludge that will emerge from the seabed."PROVINCIALE 17 WEB.mp4
The beach has vanished , the mud will emerge from the seabed, and the seaside villas destined for devaluation. This is the scene at Terra Mala , where the Tyrrhenian Link pipeline plunges into the sea toward Sicily. The massive electricity connection is almost complete. Traffic is in chaos , and while waiting for the cleanup, technicians are not hiding their concerns about possible pollution .
© Riproduzione riservata
