After a restyling, the Alberto Mura PalaMura sports hall was returned to the sports associations. An overall intervention that involved the structure: from the renovation of the parquet to the replacement of the 24-second scoreboards, up to the redevelopment of the toilets, the change of lighting and the arrangement of the roof.

The most important intervention concerned the parquet devoured by termites, for which it was necessary to create, with sums equal to 48 thousand euros, a new floor with an area of 670 square meters. Other interventions involved the renovation of the bathrooms (8 thousand euros), the replacement of the 24-second scoreboards that had failed making the structure unusable for wheelchair basketball (6,100 euros). The intervention to replace the lighting system was carried out by Engie Italia with LED projectors that replaced the old lamps. In the coming months, thanks to a loan from the metropolitan network, structural works will be carried out on the exterior of the PalaMura, including the reconstruction of the fence.

"It is from the 1999-2000 sports season that not so important works have been carried out at PalaMura - declares the councilor for Sport Simona Fois - for this reason, since our establishment we have identified the need to intervene immediately. The building hosts daily activities of sports clubs that, by playing in prestigious championships, give prestige to the city: they deserve to operate in the best conditions ".

Work is also underway on the turf of the field in Piazza Cagliari and maintenance interventions in fields 1 and 2.

© Riproduzione riservata