The trucks arrive: the maxi wind turbines ready for departure from the port of Oristano
The journey of the gigantic towers that arrived in April begins. The docks have already been leveled and the trees cut down. The mayor of Villanovaforru: «Convoy on 131 coming soon»Per restare aggiornato entra nel nostro canale Whatsapp
At the port of Oristano everything is ready for the transport of the gigantic shovels destined to be installed from Villacidro to Domusnovas.
The towers and turbines landed last April 22nd, after a passage to the Canary Islands. Since then they have been placed on the quay of the industrial port in western Sardinia.
In recent weeks , the pitches have been leveled and the trees cut along the route to be taken by the exceptional transport.
This morning part of the gigantic load was hooked to the tractors.
«They are starting to load the towers with new shovels», reports the mayor of Villanovaforru Maurizio Onnis, who with his administration has led a technical and judicial battle against the assault on his territory. He discloses the photo of the operations in progress and adds: « It is not far-fetched to hypothesize a convoy traveling on the 131 tomorrow or later. These elements, under the viaducts, pass to the centimetre."
(Unioneonline/E.Fr.)