Work continues on the 729 Sassari-Olbia state road.

And to make room for the construction sites of lot 4 , starting from 13 September there will be temporary closures to traffic on state road 597, between Oschiri and Berchidda, in the province of Sassari.

In detail, until 16 September traffic will suffer interruptions lasting no more than 15 minutes and for a maximum number of 3 per day , delayed in the time slot between 10 and 16 chosen to limit inconvenience.

A "necessary measure" to allow the completion of two overpasses located respectively in the vicinity of km 42,500 and km 49,850, and in particular for the launch of the beams.

The works of lot 4 consist in the construction of a new section of 9.5 km , with the doubling of the current roadway constituted by the SS 597, starting from the end of lot 3, up to the beginning of lot 5, already open to traffic . The total investment is 73 million euros .

(Unioneonline / lf)

© Riproduzione riservata