Useful interventions in the internal road network have been recently completed by the municipal administration of Palau ; they concern the peripheral areas of Tauladori and Maltineddu .

For a few weeks, in Tauladori , the Manna Administration informs, an area of the town penalized by the flooding of the torrent, work has been carried out to restore the road surface , until now in beaten earth which, due to the formation of streams of rainwater, made it difficult to travel. In addition to having brought the roadway to a level and given the right slope, it has been asphalted to solve once and for all the problem that afflicts the numerous residents.

« The second step will be to build , together with the Union of Municipalities and jointly with the Municipality of Arzachena, the bridge so as to also resolve the problem of flooding and the danger that the small bridge creates».

As regards Maltineddu, an area of the Municipality that has recently grown in terms of housing, asphalt was spread on a connecting road that until now was dirt, with all that this entailed, in the rainy season and considering the various differences in level. "The bituminization was carried out with a new and specific amalgam which required the installation of a particular and complex production plant directly on site. A decisive and definitive job - concludes the Municipal Administration - which also involves the entrance ramps to the various homes".

© Riproduzione riservata