LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 13 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
urban network

Bitti and the post-flood: the tender for the work on the new sewerage system has been awarded

The interventions and pipelines along a two and a half kilometer route
22 febbraio 2024 alle 10:11
Bitti and the post-flood: the tender for the work on the new sewerage system has been awarded
Il tracciato (foto concessa)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_2
  • Sull’attenti, Pete
    Caffè Scorretto

    Sull’attenti, Pete

    Celestino Tabasso

Articoli correlati

Diver dies in buoy field: investigation into employer. Rope mystery
Santa Teresa Gallura

Diver dies in buoy field: investigation into employer. Rope mystery

Investigations are ongoing following the death of Sassari native Fabio Farina. The Prosecutor's Office has opened a manslaughter investigation.
Andrea Busia
Orroli, the Municipality praises the Civil Protection Department
the ceremony

Orroli, the Municipality praises the Civil Protection Department

Rewarded for efforts to address weather emergencies and fires across the region
Sonia Gioia
New Year's Eve 2027: Oristano is looking for funding and a big name to bring to the stage in Piazza Roma.
the big concert

New Year's Eve 2027: Oristano is looking for funding and a big name to bring to the stage in Piazza Roma.

The Region has been asked to contribute 155,000 euros to double the funds allocated by the Municipality.
Marianna Guarna
Two evenings of traditional Tablao Flamenco in Cagliari
music

Two evenings of traditional Tablao Flamenco in Cagliari

The trio of Ismael Sierra, Valentina Pilia, and Mitja Obed on stage at Su Tzirculu
Enrico Melis Costa
Narbolia, two days of celebrations in honor of Santa Reparadedda
traditions

Narbolia, two days of celebrations in honor of Santa Reparadedda

Appointment Thursday 19th and Friday 20th November
SERAFINO CORRIAS
Paulilatino: Mayors hold a sit-in on Provincial Road 17.
the protest

Paulilatino: Mayors hold a sit-in on Provincial Road 17.

Along with Domenico Gallus, the mayors of Milis and Bauladu also ask for the immediate restoration of the section that is no longer passable.
Sara Pinna
Sassari: Man insults mother and attacks brother; arrested
the story

Sassari: Man insults mother and attacks brother; arrested

A 30-year-old man ended up in prison in Bancali after repeated mistreatment.
Emanuele Floris
Sassari: Refusal to perform official duties: 8-month sentence requested for former city councilor Giuseppe Palopoli
court

Sassari: Refusal to perform official duties: 8-month sentence requested for former city councilor Giuseppe Palopoli

The prosecution disputes the delays in supporting the NAS (National Security Agency) in installing security cameras at the Sorso nursing home. The defense seeks acquittal, with a verdict expected in…
Emanuele Floris
"Windows boarded up due to stench and a rat invasion": the Via Castelli revolt against waste.
the protest

"Windows boarded up due to stench and a rat invasion": the Via Castelli revolt against waste.

A mountain of garbage and perpetual uncivilized people lies beneath the Tuvumannu apartments. After the latest cleanup, the area has returned to chaos.
Stefania Lapenna

The works to revolutionize the Bitti sewage system have been awarded. The tender for the "Renovation of the sewer collectors and related connections in the urban network of Bitti" was awarded by Abbanoa.

Bitti was devastated in 2020 by a flood that cost the lives of three people .

The damage to the water and sewerage utilities was extensive: kilometers of pipes damaged and in some cases uprooted from the ground. Abbanoa had created a task force of technicians to restore full operation of its infrastructures in a short time.

Although the sewerage network had been made operational again, a structural intervention was needed to be carried out through the funds made available by the Civil Protection.

Having obtained the resources, more than two million euros, and the authorizations to carry out the works, Abbanoa launched the tender, which has now been awarded.

The new pipelines will be built along via Monte Zebio, via Arborea, via Bixio, via Brescia, Corso Vittorio Veneto and districts, via Tolmino, via Oslavia, via Brigata Reggio, via Brigata Sassari, via Trento, via Papa Giovanni XXIII, via Sa Pineta , via Mameli, via Sicilia, via Roma, via Marconi, via Cavallotti, piazza Asproni and via Deffenu.

Overall, it is about two and a half kilometers along a route, explains Abbanoa, «designed to eliminate interference with the hydraulic network of rainwater to avoid mixing, in the event of rain, between rainwater and sewage sewage. . Both, therefore, will have different channels to prevent heavy rainfall from causing damage to the sewer system."

(Unioneonline/ss)

© All rights reserved