Works at Tresnuraghes for the upstream and downstream connections of the new section of pipeline built at Porto Alabe in via dei Lentischi.

The operations of the Abbanoa technicians will take place on Friday 10 February from 10.15 to 15: in this time slot there will be drops in pressure and temporary interruptions in the road affected by the intervention.

(Unioneonline/ss)

© Riproduzione riservata