Construction sites open in the tourist port of Castelsardo. Yesterday morning, work began on the resurfacing of the retaining wall in reinforced concrete, located along the access road to the tourist port, which has numerous damaged portions, characterized by the expulsion of the iron cover and evident corrosion and oxidation phenomena of the steel reinforcement bars.

The industrial pavement in reinforced concrete of the internal road of the port, which extends from the eastern dock along all the structures of the services connected to the port, will also be resurfaced. Interventions will also be made on lighting.

In the next few days, work will also begin on replacing the pedestrian bridge over the canal connecting to the Rio Frigiano. The structure, built in 2006-07 in laminated wood, is decidedly degraded. In this way, the tourist port will be made more efficient with a recovery project worth approximately 200 thousand euros.

© Riproduzione riservata