Traffic chaos in Piazza Deffenu, Via Sonnino, and surrounding streets this morning in Cagliari, compounded by the closure of the first stretch of Viale Diaz. The new construction site is due to urgent repairs requested by a private company, Gru Service of Assemini. The traffic closure, signaled by barriers placed a few dozen meters before the actual construction site, began this morning at 9:00 a.m. and will continue until 5:00 p.m.

The affected section is between Via Pirastu and Via Sonnino, that is, from the first intersection after Piazza Deffenu to the traffic light . A temporary two-way system has been implemented on the Viale Diaz side of the Viale Bonaria lane, further reducing the available lanes for cars.

Inevitably, traffic came to a standstill. Not only were drivers attempting to pass on Viale Diaz affected, but also the surrounding streets : those coming from the opposite direction and those arriving from Via Sonnino, Via XX Settembre, and Viale Regina Margherita, with long lines at the traffic lights even on the porticoed side of Via Roma.

(Unioneonline/r.sp.)

© Riproduzione riservata